Carlsbad Concrete Group is the North County region's leading specialist in heavy-duty parking slabs, specializing in RV pads, boat trailer pads, and side-yard storage slabs. We offer shed pads and thickened-edge trailer aprons.

Get a free concrete estimate

Pads That Carry the RV, the Boat and the Trailer

Our team provides line-pump pours for narrow side yards, delivering firm parking for homes and load-ready slabs for both residential and commercial projects. Behind every pad stand 11 years in business and a 1-year workmanship warranty, and we have placed over 1,460 projects, from a 520 sq ft side yard pad to a 1,100 sq ft rural driveway.

From the thickened edge under the wheel path to the slope that sends water to the street, our team handles every detail. Serving Carlsbad and neighboring Solana Beach, Poway, Bonsall and Harmony Grove, we plan how the RV gets onto the pad before we plan the pad itself.

Call now for a free estimate, and we will measure your gate, your side yard and the turn in from the street.

What you can hold us to

The Crew Behind Every Pour

11 yearsForming, pouring and finishing concrete across North County
1,460Driveways, decks, walls, slabs and commercial flatwork completed
1-year workmanship warranty1-year written workmanship warranty from the day the concrete is placed
35 milesFrom Carlsbad to Del Mar, Rancho Santa Fe, Poway and Bonsall

Sean's 520 sq ft Side Yard in Lomas Santa Fe

Broom-finished concrete side-yard pad holding a covered boat on a trailer beside a small storage shed, sloped toward the street

Sean, Lomas Santa Fe, Solana Beach

Concrete RV Pads and Side Yard Slabs

Material
thickened broom-finished slab
Size
520 sq ft side yard
Est. investment
$4,900 to $6,800
Est. duration
2 to 3 days

A narrow side yard of loose gravel where a boat trailer kept sinking

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

Sean in Solana Beach had a narrow side yard of loose gravel where a boat trailer kept sinking. We poured a thickened broom-finished slab on a compacted base with rebar, sloped toward the street so water leaves the lot. The pad was an estimated $4,900 to $6,800 and took an estimated 2 to 3 days on site, plus the cure before the trailer rolled back on. Sean now has a firm pad that holds the boat trailer and a storage shed on one small footprint.

How Big an RV or Boat Pad Should Be

An RV pad is sized from the vehicle you own plus room to walk around it, open its doors and run the slide-outs. A motorhome, a fifth-wheel, a travel trailer and a boat on its trailer each sit differently, so we measure the real rig, the tongue and the overhang instead of working from a brochure length. Most residential pads we pour cover about 400 to 700 sq ft of thickened slab for an RV, boat or storage, and long side yards in Poway and Bonsall often take the larger end.

Poured concrete retaining wall with board-formed texture holding a level lawn above a dry concrete patio, lit at dusk

Thickness and Steel Under the Tires

The tires decide how an RV pad is built, since a loaded rig rests its whole weight on a few small contact patches and a jack stand. Driveway-weight concrete is not enough under a loaded motorhome, so the field of the pad goes in at 5 to 6 in. with the edges thickened under the wheel path. Rebar on chairs holds any crack tight, dowels carry the load across joints where wheels cross, and isolation joints keep the pad from pushing against a house footing or a block wall. Horse trailers on Karen's 1,100 sq ft rural driveway in Bonsall roll over the same broom-finished concrete with thickened edges.

Loose gravel and soft fill are why Sean's trailer kept sinking, and expansive clay on inland lots in Harmony Grove Village swells and shrinks with the seasons. We excavate to firm soil, compact a crushed rock base and check it before the pour.

Gate Width, Turning Room and the Street Curb

We plan the route onto the pad before the pad, because a flawless slab behind a gate the rig cannot swing through is useless, and on long Rancho Santa Fe drives the last turn is often tighter than the gate. We measure the gate opening, the fence posts, the turn from the street and any slope at the side yard entrance. When the RV needs its own way in from the street, a second approach and curb cut is a separate permitted job through our driveway approach and curb cut service.

Narrow side yards rarely let a mixer truck in, so a line pump carries the concrete through a hose from the street, which keeps the truck off your drive and is how the Lomas Santa Fe side yard was poured.

New broom-finished gray concrete driveway with a troweled border and saw-cut joints in front of a stucco garage, with a trimmed tree and succulents at golden hour

RV Parking Rules and the Permit Process

RV parking rules are checked before the pour, because a pad you cannot legally use is wasted money. Carlsbad publishes an information bulletin on storing recreational equipment such as campers, motor homes, trailers and boats on private property, and many associations limit RV and boat parking in their CC&Rs. Inside a gated Fairbanks Ranch community or a Lake San Marcos association, the board's approval often comes before any city question. Whether the slab or a shed on it needs a permit depends on the address, in Carlsbad or out in Elfin Forest, and the quote states it plainly.

Side-Yard Storage and Shed Slabs

A side-yard storage slab is the same build at a smaller scale, and it turns a strip of dirt into usable space for bins, a shed or a workshop bench.

Gently curved light broom-finished concrete front walk with a troweled border leading from the curb to a front door past drought-tolerant plants

What Every RV Pad Includes

Slab thickness
4 in. for walks and patios, 5 to 6 in. for driveways and RV pads
Reinforcement
Rebar set on chairs in the middle of the slab, not wire mesh left on the ground
Base
Compacted crushed rock base under every slab, checked before the pour
Control joints
Saw-cut or tooled joints laid out so cracks follow the lines, not the middle of a panel
Finishes
Broom, salt, exposed aggregate, stamped or smooth troweled, named in the quote
Drainage slope
Every slab sloped away from the house and toward a drain or the street
Demolition
Tear-out and haul-off of the old concrete included in replacement quotes
Cure before driving
Typically 7 days before cars, about 3 to 4 weeks before heavy trucks or RVs
Permits
Driveway approaches, retaining walls and foundations permitted; we pull the permit and book the inspection
Plain concrete price
Broom-finish concrete typically runs $6 to $13 per sq ft installed
Stamped concrete price
Stamped concrete typically runs $8 to $19 per sq ft installed
Exposed aggregate price
Exposed aggregate typically runs $7 to $18 per sq ft installed
Board-formed price
Board-formed walls typically run $30 to $100 per sq ft of wall face
Crew
A crew of 3 to 5 on pour day, with the finishing foreman on every pour
Payment terms
Deposit no more than 10% or $1,000, whichever is less, then progress payments as the work is done
Lead time
Typically 1 to 3 weeks from signed quote to pour day, longer when a permit is needed

RV Pad Cost in Carlsbad

Most RV pads and side-yard slabs we pour around Carlsbad are estimated at roughly $2,400 to $8,400 per project, and size, thickness, access for the pump and any tear-out move the price most. A pad that needs a new curb cut to reach it carries the driveway approach and curb cut as a separate permitted line.

RV pad or side-yard slab

Est. investment
$2,400 to $8,400 per project
Est. duration
2 to 3 days

About 400 to 700 sq ft of thickened slab for an RV, boat or storage

Driveway tear-out and repour

Est. investment
$3,200 to $10,400 per project
Est. duration
2 to 5 days

Demolition, haul-off, compacted base, rebar and a broom or exposed finish for a 2-car drive

Stamped or colored patio

Est. investment
$3,200 to $7,600 per project
Est. duration
2 to 4 days

Integral color, a stamp pattern and release, sealed after cure, about 400 sq ft

Pool deck replacement

Est. investment
$4,800 to $18,000 per project
Est. duration
4 to 7 days

Tear-out around the coping, new base and steel, a cool broom, salt or exposed finish

Engineered retaining wall

Est. investment
$8,000 to $24,000 per project
Est. duration
5 to 10 days

A poured cantilevered wall with footing, steel and drainage behind it, about 50 linear ft

Board-formed architectural wall

Est. investment
$6,000 to $20,000 per project
Est. duration
1 to 2 weeks

Rough-sawn board forms leave the wood grain in the face, about 200 sq ft of wall

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

JobEst. investmentEst. time on site
RV pad or side-yard slabEst. $2,400 to $8,400 per projectEst. 2 to 3 days
Driveway approach and curb cutEst. $1,300 to $7,800 per projectEst. 2 to 4 days
Driveway tear-out and repourEst. $3,200 to $10,400 per projectEst. 2 to 5 days
Sport court slabEst. $4,500 to $9,000 per projectEst. 3 to 5 days

Sean's pad sat in the middle of that range at an estimated $4,900 to $6,800, because the 520 sq ft side yard was pumped from the street and the gravel had to be dug out first. A pad poured with a sport court slab or a driveway tear-out and repour on the same visit typically shares the pump and the crew.

All RV pad figures here are estimates for Carlsbad and are subject to change after we measure. Your written quote sets the final price and the pour schedule, and it depends on the pad size, the slab thickness and the access.

RV Pad Slab Options Compared

An RV pad needs the heaviest build, a boat or trailer pad comes next, and a shed pad is the lightest.

SlabWhat it carriesHow we build itEst. time on site
RV padA motorhome or fifth-wheelThickened edges, rebar and dowels at jointsEst. 2 to 3 days
Boat or trailer padA boat trailer or utility trailerThickened slab, rebar, sloped to the streetEst. 2 to 3 days
Shed or storage slabA shed, bins or a workbenchStandard slab, rebar, isolation joint at the houseEst. 1 to 2 days

RV Pad Materials and Finishes

A broom finish, typically estimated at $6 to $13 per sq ft installed, is our standard on an RV pad because tires and boots grip it in the wet. Exposed aggregate, typically estimated at $7 to $18 per sq ft installed, hides tire marks on a pad that faces the street, and a pad joined to the drive can match a replacement driveway poured at the same time.

Sand-colored concrete entry steps with a landing and black metal handrail leading to the arched door of a Tudor-style house

Why RV Owners Choose Our Crew

RV owners choose us because, after 1,460 projects, we still measure the rig and the route before we price the slab, so the pad fits what actually parks on it. A crew of 3 to 5 on pour day, with the finishing foreman on every pour, places and brooms a 700 sq ft pad in one pour. Every pad carries our 1-year written workmanship warranty from the day the concrete is placed, and the deposit is no more than 10% or $1,000, whichever is less.

RV Pad Service Areas

We pour RV and trailer pads within a 35-mile radius of our Carlsbad yard, from Solana Beach side yards to Poway lots with room for a motorhome and Bonsall horse properties with trailer parking. Elfin Forest, Harmony Grove and Rancho Santa Fe are on our full North County coverage page.

Wide broom-finished concrete driveway approach with a flush curb cut and saw-cut joints in front of a two-car garage at sunset

Related Slab Services

An RV pad often needs its own curb cut and widened approach from the street, a side yard that collects water may need a trench drain or drainage channel along the house, and a roofed building on the slab is a job for an ADU or addition slab foundation.

RV Pad Questions From Carlsbad Homeowners

How much does an RV pad cost in Carlsbad?

An RV pad or side-yard slab is estimated at roughly $2,400 to $8,400, and your written quote sets the final price after we measure.

How thick should an RV pad be?

We pour RV pads 5 to 6 in. thick with edges thickened under the wheel path, set by the weight of the rig.

When can I park my RV on the new pad?

Cars can typically use the pad after about 7 days, and RVs wait an estimated 3 to 4 weeks for the slab to gain strength.

Can I park an RV in my side yard in Carlsbad?

It depends on the city bulletin and any association rules for your lot, and we check both before you commit to the pour.

Can you pour a pad in a narrow side yard?

Yes, a line pump carries concrete through a hose from the street when the truck cannot reach the side yard.

Do I need a new curb cut for an RV pad?

Only when the RV needs its own way in from the street, and that approach is permitted separately.

Can the same pad hold a boat trailer and a shed?

Yes, Sean's pad in Lomas Santa Fe holds both, with the shed set where it leaves the trailer a straight pull in.

Book Your RV Pad Estimate

Request a free estimate, and we will measure the rig, the gate and the side yard, then send a written quote for a pad that carries the weight.

Driveways, Decks and Walls

Start to finish

From Site Walk to Final Walkthrough

  1. Site walk and grades

    We measure the area, shoot the grades and check drainage before anything is quoted.

  2. Written quote and layout

    The quote names the tear-out, base, reinforcement, finish and control joint layout.

  3. Forms, base and steel

    The subgrade is compacted and the forms and rebar are checked before the truck is booked.

  4. Pour, finish and cure

    The crew places, finishes and cuts the joints, then walks the cured work with you.

Free estimate

Ready to Talk About Concrete RV Pads and Side Yard Slabs?

Call us or send the form, and we will book a site walk and measure the job.

Call (760) 281-4605

Calls only, we do not receive text messages.

Call (760) 281-4605