Sean's RV pad, Lomas Santa Fe, Solana Beach
Sean had a narrow side yard of loose gravel where his boat trailer kept sinking. We recommended a thickened, broom-finished slab on a compacted base with rebar, sloped toward the street so water leaves the lot. The 520 sq ft pad was an estimated $4,900 to $6,800 job and took an estimated 2 to 3 days. Result: a firm pad that holds the boat trailer and a storage shed on one small footprint.
Charles's board-formed entry wall, the Covenant, Rancho Santa Fe
Charles was adding a contemporary wing that had to sit well beside Spanish Colonial Revival neighbors. For 180 sq ft of courtyard entry wall, we suggested rough-sawn board forms with staggered joints, a warm gray mix and a mock-up panel approved before the full wall was poured. His wall was an estimated $13,500 to $18,500 project over an estimated 1 to 2 weeks. The finished face shows the wood grain and reads as part of the landscape at the gate.
Rachel's retaining wall, Olivenhain, Encinitas
Rachel's sloped back yard lost soil onto the patio after every winter rain. We recommended an engineered cantilevered wall, 54 linear ft and 5 ft tall, with a drain line and gravel behind it, built to the plan the permit needed. The smooth sacked wall was an estimated $17,500 to $23,500 job and ran an estimated 7 to 10 days. She now has a flat, usable yard above and a dry patio below.
Jason's ADU slab, Harmony Grove Village
Jason planned a detached ADU at the back of a newer lot, with plumbing set before the pour. We poured footings and a 780 sq ft slab-on-grade with thickened footings and a vapor barrier to the engineer's plan, and booked the inspector before the truck. The foundation came in at an estimated $9,200 to $12,800 and took an estimated 4 to 7 days. The slab was signed off first time and ready for framing the next week.
Thomas's entry steps, Old Del Mar
Thomas lived on a steep street where the original entry steps had risers that varied by more than an inch. We rebuilt 8 steps with equal risers, a wider landing and a new handrail footing, in integral sand-colored concrete matched to the Tudor trim. His steps were an estimated $3,400 to $4,800 and took an estimated 3 to 4 days. Every riser is now the same height, and the climb to the front door is safer.
Robert's apartment drive aisle, near Poway Road (commercial)
Robert manages an apartment community near Poway Road where trash trucks had broken the asphalt at the turn. We replaced 9,200 sq ft of drive aisle in 6 in. reinforced concrete, in three phases so residents kept parking every night. The work was an estimated $46,000 to $64,000 and ran an estimated 2 to 3 weeks. Result: a drive aisle that carries the trash trucks without new potholes.